FHIR 5.0.0 © HL7.org  |  FHIRsmith 0.8.5  |  Server Home  |  TX Home  |  Capability Statement  |  Terminology Capabilities  |  Operations  |  Problems  |   

TX: CodeSystem v2-0472

Generated Narrative: CodeSystem v2-0472

Language: en

Properties

This code system defines the following properties for its concepts

NameCodeURITypeDescription
Statusstatushttp://hl7.org/fhir/concept-properties#statuscodeA code that indicates the status of the concept
deprecatedv2-table-deprecatedhttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-table-deprecatedcodeVersion of HL7 in which the code was deprecated
V2 Concept Commentv2-concCommenthttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentstringV2 Concept Comment
V2 Concept Comment As Publishedv2-concCommentAsPubhttp://terminology.hl7.org/CodeSystem/utg-concept-properties#v2-concCommentAsPubstringV2 Concept Comment As Published

Concepts

This case-sensitive code system http://terminology.hl7.org/CodeSystem/v2-0472 defines the following codes in a Is-A hierarchy:

CodeDisplayDefinitionStatusV2 Concept CommentV2 Concept Comment As Published
S SynchronousSynchronousactiveDo the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.Do the next specification after this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). An "S" specification implies that the second timing sequence follows the first, e.g., when a service request is written to measure blood pressure Q15 minutes for the 1st hour, then every 2 hours for the next day.
A AsynchronousAsynchronousactiveDo the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.Do the next specification in parallel with this one (unless otherwise constrained by the following fields: TQ1-7-start date/time and TQ1-8-end date/time). The conjunction of "A" specifies two parallel instructions, as are sometimes used in medication, e.g., prednisone given at 1 tab on Monday, Wednesday, Friday, and at 1/2 tab on Tuesday, Thursday, Saturday, Sunday.
C Actuation TimeActuation TimeactiveIt will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).It will be followed by a completion time for the service. This code allows one to distinguish between the time and priority at which a service should be actuated (e.g., blood should be drawn) and the time and priority at which a service should be completed (e.g., results should be reported).